The house is now staked out on the lot and today we began the laying out of the footings of the home. This process normally takes two or three days and we should have them poured by the end of the week. #4 rebar must be cut and tied into the footing for structure and the vertical #4 rebar place according to the engineering. Once the footings are poured and given a day or so to dry, the forms will be stripped, cleaned and the process begins again for the setting of the stem walls.