The electric meter box is located in the Laundry room and is neatly installed by Encore Electric.
The Gas Fireplace with a raised hearth, which will be covered with slate tile. And the mantel shelf above that we will have a maple cover to match the cabinetry. The face of the firplace will have the same ledgestone that we are going to install on the front entry columns.








Wall stacks are used to supply the heat to the upper floor.
















The furnace is 95% efficient, natural gas forced air and the water heater (not yet installed) will be a 60-70 gal. high efficiency to supply plenty of hot water for the home.








With all of the mechanical and insulation installed and inspected, sheetock was delivered on Friday, September 2 and the hangers began their work on Sunday. They should be finished sometime today and the home will be ready for the sheetrock tapers to begin.