Framing of the first floor continues.























































With the bracing done the 2nd floor joists can be layed out and installed the plywood layed down and nailed off.


















Posted by John - Certified Professional Builder/Designer at 4:31 PM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Visit these recommended links

  • B.A.R.
  • BYO Builder
  • Blueprint Design Consultants, Inc.

Blog Archive

  • ▼  2011 (18)
    • ►  October (1)
    • ►  September (1)
    • ►  August (4)
    • ▼  July (4)
      • The stairs stringers are cut and installed and the...
      • Framing of the first floor continues.
      • Now that the foundation has had time to cure and ...
      • Clean & Backfilled
    • ►  June (5)
    • ►  May (3)
Blueprint Design Consultants, Inc.

Promote Your Page Too

About Me

John - Certified Professional Builder/Designer
Bellingham, WA, United States
View my complete profile

Followers

Awesome Inc. theme. Powered by Blogger.